ThirdAxis® EBS Pvt. Ltd. is a registered company of ThirdAxis Enterprises, incorporated with a dedication to innovative solutions including, but not limited to, construction industry software. With our extensive knowledge in the construction industry of more than two generations, we understand precisely the key points to address as a software solution provider.

Play Video

Clients We Served Over the Years

1985

Mass Earth Filling work, internal roads work, Compound walls construction for Momin Nagar Project at Jogeshwari West, Mumbai which was one of the largest residential building project of that time and took 5 years for completion.

1990

Construction of large Electric Sub-Station along with power distribution centers, Cable trench, Construction of Internal Roads, Construction of Compound Wall with fencing for Kamalistan Studio at Andheri, Mumbai

1993

Huge excavation for basements, Concrete pavements and Compound wall constructions for Jogeshwari Education Trust`s Millat School & Millat Hospital Project at Jogeshwari West Mumbai. Qty Above 25000 Cubic meters

1994

Huge Excavation with over 3 million cubic meter (31,50,000 Cu.M) of earth & rock cutting on an average of 4000 to 5000 cubic meters of excavation every day during the period 1994 to 1996 for K. Raheja Construction – Raheja Vihar Project

1993

Earth Cutting, Rock & Concrete Cutting, Earth Filling Excavation for huge basement for M/s. Satellite Group for their project at Kandivali West. Mumbai. Quantity above 100,000 cubic meters

1993

Earth Cutting, Rock & Concrete Cutting, and Earth Filling Excavation for basement for M/s. Satellite Group for their project at Kandivali West. Mumbai.

1993

Earth Cutting, Rock & Concrete Cutting, and Earth Filling Excavation for basement for M/s. Satellite Group for their project at Kandivali West. Mumbai.

1996

Mass Earth Filling for leveling up a deep valley with hundreds of thousands cubic meters near Aarey Colony for Kalpana Construction Studio at Andheri, Mumbai

1996

Mass Earth Filling work of over 400,000 cubic meter for M/s. Kalpana Construction for their projects at Amboli, Veera Desai Road, Andheri West, Mumbai (formerly known as Amboli Stone Quarry).

1998

Huge Earth Cutting work over hundreds of thousands cubic meters for Essar Petroleum & Reliance Petroleum Projects.Mumbai. Qty Above 25000 Cubic meters

2000

Huge Earth Cutting & Rock cutting work over 1,00,000 cubic meters for Mumbai Pune Expressway Project for Larsen & Toubro and Shapoorji Pallonji under Contractors Mr. T. Y. Kalya & Mr. Yashwant Sable respectively.

2002

Construction of  G+18 storey buildings at Powai, Andheri East, Mumbai for M/s. J.C. Builders also known as J.C. Bhagtani . Area 89,000 sq. ft

2002

PHASE 1 – Huge Excavation for double basement with quantity of 58,000 cubic meters. Completed in 4 months’ time frame for K. Raheja Construction.

2003

Beautification of old dumping ground by cutting & levelling the huge quantity of soil heap (around 90,000 cubic meters) to help landscaping slop behind Inorbit Mall, Mindspace, Malad West, Mumbai for K. Raheja Corporation.

2003

20 meter wide, 5 meter deep x 0.6 Km long open Canal construction without diversion which included heavy earth cutting & filling over 85,000 cubic meters. Completed within 6 months for K. Raheja Corporation.

3

2004

Earth Cutting, Rock & Concrete Cutting, Earth Filling Excavation for huge basement for M/s. Satellite Group for their project at Kandivali West. Mumbai. Quantity above 100,000 cubic meters

65

2004

Earth Cutting, Rock & Concrete Cutting, and Earth Filling Excavation for basement for M/s. Satellite Group for their project at Kandivali West. Mumbai.

2004

Earth Cutting, Rock & Concrete Cutting, and Earth Filling Excavation for basement for M/s. Satellite Group for their project at Kandivali West. Mumbai.

2006

PHASE 2 – Huge Excavation for double basement with quantity of 52,000 cubic meters. Completed in 2 months’ time frame for K. Raheja Construction for infinity mall Andheri

2006

Excavation for basement & construction of a 8 meter tall RCC building at Retreat Hotel, Mud Island, Malad West, Mumbai for M/s. K. Raheja Construction

2006

PHASE 2 – Huge Excavation for double basement with quantity of 52,000 cubic meters. Completed in 2 months’ time frame for K. Raheja Construction for infinity mall Andheri

2008

Building Construction G+1 for Indian Western Railways under A.B. Construction at Mahim East. Area 14,000 sq.ft.

2009

Building construction of G+7 Storey building 70,000 sq. ft. for Fem Group`s Shanti Developers at Nalasopara East, Maharashtra

2011

Building Construction of G+5 Storey building 14,000 sq.ft. for Sat-Guru Developers at Mahim West, Mumbai